---
title: "Copy-paste prompts: drywall and insulation contractors"
description: Prompts for the office work around hanging, finishing and insulating. Copy one, change the parts in brackets, and paste it into your AI. Leads and...
---

[Skip to content](https://knowledge.projul.com/copy-paste-prompts-drywall-and-insulation-contractors#main-content)

English

Show submenu for translations

[Submit a request](https://knowledge.projul.com/kb-tickets/new?hsLang=en)

[![Projul Logo 345PX wide.png\]](https://knowledge.projul.com/hs-fs/hubfs/Projul%20Logo%20345PX%20wide.png?height=40&name=Projul%20Logo%20345PX%20wide.png)](https://knowledge.projul.com/?hsLang=en)

Open main navigation

Close main navigation

- English
  
  Show submenu for translations
- [Submit a request](https://knowledge.projul.com/kb-tickets/new)
- [Return to projul.com](https://www.projul.com/)

[Return to projul.com](https://www.projul.com/)

 How can we help?

- There are no suggestions because the search field is empty.

1. [Projul Knowledge Base](https://knowledge.projul.com/?hsLang=en)
2. [Projul AI Connect](https://knowledge.projul.com/projul-ai-connect?hsLang=en)
3. [Projul AI Connect for Drywall and Insulation Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-drywall-and-insulation-contractors)

# Copy-paste prompts: drywall and insulation contractors

## Prompts for the office work around hanging, finishing and insulating. Copy one, change the parts in brackets, and paste it into your AI.

### Leads and follow-ups

```
Add a new lead in Projul for [Rockwater Homes] called [Rockwater Lot 42 Hang and Finish] at [1188 N Sagebrush Dr, St. George, UT 84770]. Likelihood [85]%, estimator [Grace Oakes].
```

```
Add a new lead in Projul called [Alvarez Ceiling Repair] for a new client, [Ruth Alvarez], phone [(435) 555-0142], email [ruth@example.com], at [742 E Canyon View Dr, Washington, UT 84780].
```

```
Add three leads in Projul for [Rockwater Homes], one each for [Lot 42], [Lot 44] and [Lot 51] at [Sagebrush Ridge], all hang and finish with attic insulation, estimator [Grace Oakes].
```

```
Add to the project notes on [Rockwater Lot 42 Hang and Finish] in Projul: [two-story, 4 bed 3 bath, 4x12 board throughout, 5/8 Type X at the garage separation, R-38 attic, knockdown ceilings].
```

```
Schedule an estimate meeting on [Alvarez Ceiling Repair] in Projul for [Thursday] at [9 am] for one hour with [Grace Oakes].
```

```
Log on [Rockwater Lot 42 Hang and Finish] in Projul that [Dale] called this morning to release the lot and wants a price by [Friday].
```

```
Log on [Alvarez Ceiling Repair] in Projul that I called [Ruth] at [4 pm] and got no answer, left a voicemail.
```

```
Add a follow-up reminder on [Alvarez Ceiling Repair] in Projul for [Monday morning] to call about the ceiling repair.
```

```
Move [Alvarez Ceiling Repair] in Projul to the Send stage.
```

```
Mark [Rockwater Lot 42 Hang and Finish] as sold in Projul.
```

```
We lost [Alvarez Ceiling Repair]. Mark it rejected in Projul and log the reason: [price, she wanted a patch only].
```

### Takeoffs and estimates

```
Build an estimate in Projul for [Rockwater Lot 42 Hang and Finish] with five sections: insulation, hang, finish, texture, cleanup and disposal. [Give your quantities, costs and markups for each line.] Apply our [Utah] sales tax.
```

```
Create an estimate in Projul for [Rockwater Lot 44 Hang and Finish] from my [Production Hang and Finish] template. Change the board count to [224] sheets and the finish square footage to [10,750].
```

```
Create an estimate in Projul for [Alvarez Ceiling Repair]: cut out and replace [a 12 by 14 water-damaged ceiling], tape and finish, match the existing [orange peel] texture. Use my usual rates from the cost-item library and put in reasonable quantities.
```

```
Add an [Insulation] section to the estimate on [Rockwater Lot 42 Hang and Finish] in Projul with [R-13 kraft-faced wall batts, 1,850 sq ft at $0.42 plus 25%], [R-38 blown-in attic, 1,240 sq ft at $0.95 plus 25%], and [22 hours of labor at $42 plus 45%].
```

```
On [Rockwater Lot 42 Hang and Finish] in Projul, change the board count to [212] sheets and the finish square footage to [10,175], and adjust the hanging labor to match.
```

```
Add a [Fire-rated assemblies] section to [Rockwater Lot 42 Hang and Finish] in Projul with [24 sheets of 5/8 inch Type X at $17.20 plus 20%] and [10 hours of labor at $46 plus 40%].
```

```
Make [Texture] on [Rockwater Lot 42 Hang and Finish] in Projul a section where the client must choose one: [knockdown at $1,935], [orange peel at $1,613] or [Level 5 smooth at $5,913], with knockdown selected.
```

```
Add an optional [Finish upgrades] section to [Rockwater Lot 42 Hang and Finish] in Projul with [Level 5 skim coat in the great room, 1,400 sq ft at $0.55 plus 40%] and [bullnose corner bead, 340 lin ft at $0.90 plus 25%]. None selected to start.
```

```
Apply our [Utah] tax rate to the [Rockwater Lot 42 Hang and Finish] estimate in Projul.
```

```
Apply the [Repeat builder 3%] discount to [Rockwater Lot 44 Hang and Finish] in Projul.
```

```
On [Rockwater Lot 42 Hang and Finish] in Projul, show the section names and totals but hide the individual line prices in [Cleanup and disposal].
```

```
Write the introduction on the [Rockwater Lot 42 Hang and Finish] estimate in Projul: [Level 4 finish throughout, Level 5 in the entry, knockdown ceilings, we supply board, insulation, bead, mud and disposal, the builder supplies heat and power].
```

```
Write the contract text on [Alvarez Ceiling Repair] in Projul covering [texture match is approximate on an existing ceiling, dust containment, and that painting is not in our scope].
```

```
Check the [Rockwater Lot 42 Hang and Finish] estimate in Projul for anything odd: lines with no cost, sections with no lines, missing tax, or a section margin under [20]%.
```

### Change orders

```
Add a change order to [Rockwater Lot 42 Hang and Finish] in Projul called [Plan revision, added closet]: [18 sheets of 1/2 inch board at $14.80 plus 20%], [18 hours of hang and finish labor at $46 plus 40%], [1,300 sq ft of additional finish at $0.62 plus 40%]. Apply our [Utah] tax.
```

```
Add a change order to [Rockwater Lot 42 Hang and Finish] in Projul called [Smooth ceilings, main floor]: [Level 5 skim in place of knockdown, 1,900 sq ft at $0.55 plus 40%], less the [knockdown texture already priced, 1,900 sq ft at $0.18].
```

```
Add a change order to [Rockwater Lot 44 Hang and Finish] in Projul called [Sound insulation, bedroom walls]: [R-13 sound batts, 620 sq ft at $0.55 plus 25%] and [7 hours of labor at $42 plus 45%].
```

```
Add a change order to [Rockwater Lot 42 Hang and Finish] in Projul called [Recoat after trade damage]: [140 sq ft of board replacement at $1.20 plus 20%] and [14 hours of finish labor at $46 plus 40%].
```

```
Add a change order to [Rockwater Lot 51 Hang and Finish] in Projul removing [the detached garage hang and finish, 42 sheets and 1,600 sq ft of finish] from our scope.
```

```
Add a change order to [Alvarez Ceiling Repair] in Projul crediting the client [$275] because we did not need the dumpster.
```

### Scheduling the crews

```
Lay out the schedule in Projul for [Rockwater Lot 42 Hang and Finish] starting [Monday October 6]: [Insulate walls and attic] two days, [Insulation inspection] one morning, [Stock the house] half a day, [Hang] three days, [Tape and bed] two days, [Second coat] one day, [Third coat and sand] two days, [Knockdown texture] one day, [Point-up after paint] one day. Work days only, [7 am to 3:30 pm].
```

![The schedule in projul for the week with first basement finish drywall task placed on a crew member day](https://knowledge.projul.com/hubfs/Knowledge%20Base%20Import/43337452088343.png)

```
Create a task on [Rockwater Lot 42 Hang and Finish] in Projul called [Hang, main floor] for [Monday and Tuesday] from [7 am to 3:30 pm] with the [Hang crew] team on it.
```

```
Create [Third coat and sand] on [Rockwater Lot 42 Hang and Finish] in Projul with two days: [Wednesday 7 to 3:30] with [Grace Oakes] and [Priya Hutton], and [Thursday 7 to 12] with [Priya Hutton] only.
```

```
Add a deadline on [Rockwater Lot 42 Hang and Finish] in Projul: [Builder walkthrough, board complete] on [October 9].
```

```
Board delivery on [Rockwater Lot 42 Hang and Finish] moved to [Wednesday]. In Projul, push [Stock the house] to Wednesday morning and slide [Hang] and everything after it by [two] days, but leave the [Builder walkthrough] deadline alone.
```

```
No heat at [Rockwater Lot 44] yet. In Projul, move [Second coat] and [Third coat and sand] out by [three] days and tell me what else that pushes.
```

```
Put the [Finish crew] team on [Tape and bed] on [Rockwater Lot 42 Hang and Finish] in Projul.
```

```
Take [Priya Hutton] off [Knockdown texture] in Projul and put [Diane Meyer] on instead.
```

```
Create a team in Projul called [Insulation crew] with [Marco Ruiz], [Ben Okafor] and [Tina Abbott] on it.
```

```
Add these steps to [Stock the house] on [Rockwater Lot 42 Hang and Finish] in Projul: [confirm rough inspections signed off, driveway clear for the boom truck, count the delivery against the takeoff, stack by room and sheet size, note damaged sheets].
```

```
Add these steps to [Hang] on [Rockwater Lot 42 Hang and Finish] in Projul: [5/8 Type X at the garage separation, moisture-resistant board in both baths, screw pattern checked, no butt joints in the entry sightline, scrap to the dumpster each day].
```

```
Set up a repeating task in Projul: [Crew meeting and lot walk] every [Monday] at [6:30 am] with the [Hang crew] and [Finish crew] teams on it.
```

```
Mark [Insulate walls and attic] on [Rockwater Lot 42 Hang and Finish] complete in Projul and tell me which steps were left unchecked.
```

### Site notes, photos and files

```
Log a site visit on [Rockwater Lot 42 Hang and Finish] in Projul: [walked with Dale, plumbing rough not finished at the master bath, he wants smooth ceilings in the entry].
```

```
Add a note to the [Point-up after paint] task on [Rockwater Lot 42 Hang and Finish] in Projul: [painter damaged the corner bead at the stair landing, budget an extra half day].
```

```
Add a note to the [Rockwater Lot 42 Hang and Finish] estimate in Projul recording that [the builder approved the smooth ceiling upgrade by phone on Tuesday].
```

```
Upload every photo in [~/Photos/lot-42-insulation] to [Rockwater Lot 42 Hang and Finish] in Projul and label them [Insulation, before inspection].
```

```
Attach [attic-r38-depth.jpg] from [Rockwater Lot 42 Hang and Finish] in Projul to the [Insulate walls and attic] task.
```

```
List the photos and documents on [Rockwater Lot 42 Hang and Finish] in Projul and tell me which ones are not attached to anything.
```

### Templates and the cost-item library

```
What estimate templates do I have in Projul?
```

```
Save the [Rockwater Lot 42 Hang and Finish] estimate in Projul as a template called [Production Hang and Finish, two story].
```

```
Create a section template in Projul called [Attic blow, R-38] with [blown-in fiberglass, 1,200 sq ft at $0.95 plus 25%] and [6 hours of labor at $42 plus 45%].
```

```
Create a section template in Projul called [Cleanup and disposal] with [one 20-yard dumpster at $475 plus 15%] and [8 hours of scrap haul and broom clean at $38 plus 40%].
```

```
Add these to my cost-item library in Projul: [Hang labor, per sheet, $12.50, 40% markup, labor], [Finish labor, per sq ft, $0.62, 40% markup, labor], [1/2 inch board 4x12, $14.80 per sheet, 20% markup, material], [5/8 inch Type X 4x12, $17.20 per sheet, 20% markup, material], [metal corner bead, $1.35 per lin ft, 20% markup, material].
```

```
Update [Hang labor, per sheet] in my Projul cost-item library to [$13.25].
```

### Reading your own numbers

```
Tell me about the [Rockwater Lot 42 Hang and Finish] estimate in Projul: sections, totals, tax and status.
```

```
What is the margin on each section of [Rockwater Lot 42 Hang and Finish] in Projul, and which section is lowest?
```

```
List every estimate in Projul that is still a Draft, with its project and projected total.
```

```
Which leads in Projul have had no communication logged in the last [10] days?
```

```
List every project in Projul for [Rockwater Homes], with its status, estimate total and change orders.
```

```
What is on the schedule in Projul for [next week], by person, and which days is the [Finish crew] booked?
```

```
Which tasks in Projul are past their end date and still not marked complete?
```

```
How much of the [Rockwater Lot 42 Hang and Finish] estimate in Projul has been invoiced, and what is left to invoice?
```

**Note:** Anything that creates or edits a record needs a Read-Write key; reading works with either key. Publishing and sending an estimate, invoicing, payments and the time clock stay in Projul. See [Which Projul features are not available to my AI yet?](https://knowledge.projul.com/which-projul-features-are-not-available-to-my-ai-yet?hsLang=en)

### Watch it work

Short videos of Projul AI Connect doing this kind of job:

- [Site visit notes to estimate](https://video.projul.com/watch/HA5MRWeouBZbt1zBrTHucu) (1:06)
- [Voicemail to new lead](https://video.projul.com/watch/N65uTakLQhrN8E974mHubu) (0:47)
- [Shift the schedule for a delay](https://video.projul.com/watch/nhxvt6STeHTwkNoWXMuv6o) (0:49)

**New to Projul AI Connect?** Watch the [overview video](https://video.projul.com/watch/zzshbGnjK2shc1coG62oa5) (2:37): what it is, how to set it up, and an estimate built from site notes.

Questions? Let's Chat.  
support@projul.com  
(844) 776-5853

- [How Do I Use Projul?](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#main-content)

    - [Managing Employees / Contractors](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#managing-employees-contractors)
    - [Projects](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#projects)
    - [Support](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#support)
    - [Settings](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#settings)
    - [Scheduling](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#scheduling)
    - [Estimating](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#estimating)
    - [Lead Pipeline](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#lead-pipeline)
    - [Tasks](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#tasks)
    - [Time Tracking](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#time-tracking)
    - [Mobile](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#mobile)
    - [Invoicing](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#invoicing)
- [Projul FAQ's](https://knowledge.projul.com/projul-faqs?hsLang=en#main-content)

    - [Projul Data Safety & Security](https://knowledge.projul.com/projul-faqs?hsLang=en#projul-data-safety-security)
    - [Billing & Pricing](https://knowledge.projul.com/projul-faqs?hsLang=en#billing-pricing)
- [Projul AI Connect](https://knowledge.projul.com/projul-ai-connect?hsLang=en#main-content)

    - [Projects & Leads](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projects-leads)
    - [Projul AI Connect for Drywall and Insulation Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-drywall-and-insulation-contractors)
    - [Reference](https://knowledge.projul.com/projul-ai-connect?hsLang=en#reference)
    - [Projul AI Connect for Window and Door Installers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-window-and-door-installers)
    - [Connect your AI](https://knowledge.projul.com/projul-ai-connect?hsLang=en#connect-your-ai)
    - [Projul AI Connect for Electricians](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-electricians)
    - [Projul AI Connect for Landscapers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-landscapers)
    - [Tasks & Scheduling](https://knowledge.projul.com/projul-ai-connect?hsLang=en#tasks-scheduling)
    - [Projul AI Connect for Roofers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-roofers)
    - [Troubleshooting & Limits](https://knowledge.projul.com/projul-ai-connect?hsLang=en#troubleshooting-limits)
    - [Projul AI Connect for HVAC Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-hvac-contractors)
    - [Projul AI Connect for Commercial General Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-commercial-general-contractors)
    - [Projul AI Connect for Paving Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-paving-contractors)
    - [Prompt Cookbook](https://knowledge.projul.com/projul-ai-connect?hsLang=en#prompt-cookbook)
    - [Projul AI Connect for Plumbers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-plumbers)
    - [Start here](https://knowledge.projul.com/projul-ai-connect?hsLang=en#start-here)
    - [Projul AI Connect for Excavation Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-excavation-contractors)
    - [Messages](https://knowledge.projul.com/projul-ai-connect?hsLang=en#messages)
    - [Projul AI Connect for Tile Installers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-tile-installers)
    - [Projul AI Connect for Deck Builders](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-deck-builders)
    - [Webhooks](https://knowledge.projul.com/projul-ai-connect?hsLang=en#webhooks)
    - [Projul AI Connect for Pool Builders](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-pool-builders)
    - [Projul AI Connect for Painters](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-painters)
    - [Projul AI Connect for Concrete Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-concrete-contractors)
    - [Projul AI Connect for Restoration Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-restoration-contractors)
    - [Projul AI Connect for Remodelers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-remodelers)
    - [Photos & Files](https://knowledge.projul.com/projul-ai-connect?hsLang=en#photos-files)
    - [Projul AI Connect for Flooring Installers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-flooring-installers)
    - [Projul AI Connect for Carpenters](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-carpenters)
    - [Projul AI Connect for Home Builders](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-home-builders)
    - [Estimates](https://knowledge.projul.com/projul-ai-connect?hsLang=en#estimates)
    - [Clients](https://knowledge.projul.com/projul-ai-connect?hsLang=en#clients)
    - [Teams](https://knowledge.projul.com/projul-ai-connect?hsLang=en#teams)
    - [Projul AI Connect for Fence Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-fence-contractors)
    - [Projul AI Connect for Design-Build Firms](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-design-build-firms)

[![Chill listening crop-3](https://knowledge.projul.com/hs-fs/hubfs/Projul%20Logo%20345PX%20wide.png?width=94&height=24&name=Projul%20Logo%20345PX%20wide.png "Chill listening crop-3")](http://projul.com)

Projul Knowledge Base

Copyright © 2026, Projul Inc