---
title: "Copy-paste prompts: painters"
description: Prompts for the work a painting company does every week. Copy one, change the parts in brackets, and paste it into your AI. Leads and clients Add a lead...
---

[Skip to content](https://knowledge.projul.com/copy-paste-prompts-painters#main-content)

English

Show submenu for translations

[Submit a request](https://knowledge.projul.com/kb-tickets/new?hsLang=en)

[![Projul Logo 345PX wide.png\]](https://knowledge.projul.com/hs-fs/hubfs/Projul%20Logo%20345PX%20wide.png?height=40&name=Projul%20Logo%20345PX%20wide.png)](https://knowledge.projul.com/?hsLang=en)

Open main navigation

Close main navigation

- English
  
  Show submenu for translations
- [Submit a request](https://knowledge.projul.com/kb-tickets/new)
- [Return to projul.com](https://www.projul.com/)

[Return to projul.com](https://www.projul.com/)

 How can we help?

- There are no suggestions because the search field is empty.

1. [Projul Knowledge Base](https://knowledge.projul.com/?hsLang=en)
2. [Projul AI Connect](https://knowledge.projul.com/projul-ai-connect?hsLang=en)
3. [Projul AI Connect for Painters](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-painters)

# Copy-paste prompts: painters

## Prompts for the work a painting company does every week. Copy one, change the parts in brackets, and paste it into your AI.

### Leads and clients

```
Add a lead in Projul for a new client, [Nora Whitfield], phone [(435) 555-0119], email [nora@example.com]. The job is [Whitfield Interior Repaint] at [742 N Bluff St, St. George, UT 84770]: five rooms, ceilings, trim and doors. Likelihood [70]%.
```

```
Here is the web form that came in overnight. Create the client and the lead in Projul from it and put the description in the project notes. [Paste the form.]
```

```
Add a lead in Projul for [Ray Cardoza], who we painted inside two years ago, called [Cardoza Exterior Repaint] at the same address. Body, trim, fascia and soffits, wanted in [April].
```

```
Add four leads in Projul for [Ridgeline Property Management]: unit repaints at [12, 14, 21 and 23 Ridgeline Ct]. Two coats on walls and ceilings, trim as needed.
```

```
Update [Nora Whitfield] in Projul: her new mobile is [(435) 555-0187] and add [nora.whitfield@example.com] as a second email.
```

### Follow-ups and the pipeline

```
Log on [Whitfield Interior Repaint] in Projul that I called Nora this morning, reached her, and she picked [Alabaster] for the ceilings.
```

```
Log on [Cardoza Exterior Repaint] in Projul that I tried Ray at [4 pm] and got no answer.
```

```
Log a site visit on [Ridgeline Unit 12] in Projul: walked it with the property manager, two rooms need a stain-blocking primer.
```

```
List every lead in Projul in the Send stage with no follow-up logged in the last [10] days, with the client, the phone number and the estimate total.
```

```
Which exterior leads in Projul have been sitting since [last summer] without an answer?
```

```
Create a follow-up reminder in Projul on [Whitfield Interior Repaint] for [next Monday at 8 am], assigned to [Dana Kessler], called [Call about the estimate].
```

```
Move [Whitfield Interior Repaint] in Projul to the Send stage.
```

```
Mark [Whitfield Interior Repaint] in Projul as sold and log that Nora approved by phone.
```

```
Mark [Ridgeline Unit 12] in Projul as lost. They used an in-house crew. Log the reason.
```

### Interior estimates

```
Create an estimate for [Nora Whitfield] on [Whitfield Interior Repaint] in Projul from my [Interior Repaint, 2 coat] template. Apply our [Utah] sales tax.
```

```
Build an estimate in Projul for [Whitfield Interior Repaint] with sections for [surface prep, ceilings, walls, trim and doors, materials and sundries]. Walls [3,240] sq ft at [$0.72] per sq ft with [45]% markup; ceilings [1,180] sq ft at [$0.65] with [45]%; base and casing [412] lin ft at [$1.85] with [45]%; [11] doors at [$62] each with [45]%; [18] gallons of [interior eggshell] at [$46] with [30]%; [4] gallons of [ceiling flat] at [$32] with [30]%; [3] gallons of [semi-gloss enamel] at [$54] with [30]%; prep [14] hours at [$48]/hr with [45]%. Apply our [Utah] tax.
```

```
Create an estimate in Projul for [Ridgeline Unit 14] laid out as [prep, walls and ceilings, trim, materials]. Use my usual rates from the cost-item library, put in reasonable quantities for a [950] sq ft two-bedroom unit, and I will correct them.
```

```
On [Whitfield Interior Repaint] in Projul, change the wall square footage to [3,510], raise prep to [18] hours and add [2] more gallons of eggshell.
```

```
Add a [Cabinets] section to [Whitfield Interior Repaint] in Projul: [22] doors and [6] drawer fronts, [26] hours at [$52]/hr with [45]%, and [3] gallons of [cabinet enamel] at [$78] with [30]%.
```

### Exterior estimates

```
Build an estimate in Projul for [Cardoza Exterior Repaint]. Wash and prep: pressure wash [2,600] sq ft, [6] hours at [$48]/hr with [45]%; scrape and sand [16] hours at [$48] with [45]%; caulk [8] hours at [$48] with [45]% plus [24] tubes at [$9.50] with [30]%. Body: [2,600] sq ft at [$0.95] per sq ft with [45]% plus [12] gallons of [exterior acrylic] at [$68] with [30]%. Trim, fascia and soffits: [640] lin ft at [$2.40] with [45]% plus [4] gallons of [exterior semi-gloss] at [$72] with [30]%. Apply our [Utah] tax.
```

```
Add a [Spot priming] section to [Cardoza Exterior Repaint] in Projul: [4] hours at [$48]/hr with [45]% and [2] gallons of [bonding primer] at [$62] with [30]%.
```

```
Add a [Deck and railing stain] section to [Cardoza Exterior Repaint] in Projul: [480] sq ft at [$1.35] per sq ft with [45]% and [4] gallons of [semi-transparent stain] at [$58] with [30]%.
```

```
On [Cardoza Exterior Repaint] in Projul, add a line to the body section for [1] extra coat on the [south elevation], [420] sq ft at [$0.95] with [45]%.
```

### Options, visibility and the write-up

```
On [Whitfield Interior Repaint] in Projul, make [Cabinets] a selection where the client must choose one: [repaint in place $2,850], [sprayed refinish $4,600], or [leave as is $0]. Start with the repaint selected.
```

```
Add an optional [Extras] section to [Cardoza Exterior Repaint] in Projul where the client can add any of: [stain the back deck $1,450], [paint the garage floor $980], [front door in a custom color $340]. None selected.
```

```
Hide the line prices in [Surface prep] and [Materials and sundries] on [Whitfield Interior Repaint] in Projul but keep the section totals showing.
```

```
Apply the [Repeat client 5%] discount to [Cardoza Exterior Repaint] in Projul.
```

```
Read the [Whitfield Interior Repaint] estimate in Projul and write an introduction for Nora saying which surfaces we are painting, how many coats, and that we move and replace the furniture.
```

```
Set the title on the [Cardoza Exterior Repaint] estimate in Projul to [Full Exterior Repaint, Body and Trim] and make it expire in [30] days.
```

```
Check the [Whitfield Interior Repaint] estimate in Projul for anything odd: lines with no cost, sections with no lines, missing tax, or a margin under [35]%.
```

### Change orders

```
Add a change order to [Whitfield Interior Repaint] in Projul called [Family room accent wall]: [2] hours of cut-in at [$52]/hr with [45]% and [1] gallon of [deep base eggshell] at [$58] with [30]%. Apply our [Utah] tax.
```

```
Add a change order to [Whitfield Interior Repaint] in Projul called [Third coat, dining room]: [520] sq ft at [$0.55] per sq ft with [40]% and [2] gallons at [$46] with [30]%.
```

```
Add a change order to [Whitfield Interior Repaint] in Projul called [Wallpaper removal, back bedroom]: [12] hours at [$48]/hr with [45]%, [1] lot of stripper and compound at [$95] with [30]%, and [1] gallon of [primer sealer] at [$44] with [30]%.
```

```
Add a change order to [Cardoza Exterior Repaint] in Projul crediting the client for the [8] shutters we are no longer painting at [$65] each, because they are being replaced.
```

```
Add a change order to [Ridgeline Unit 21] in Projul for the [two rooms of stain-blocking primer] we found on the walkthrough: [6] hours at [$48] with [45]% and [3] gallons of [stain-blocking primer] at [$52] with [30]%.
```

### Templates and your cost-item library

```
What estimate templates do I have in Projul?
```

```
Save the [Whitfield Interior Repaint] estimate in Projul as a template called [Interior Repaint, 2 coat].
```

```
Create a section template in Projul called [Exterior wash and prep] with [pressure wash, 6 hours at $48/hr plus 45%], [scrape and sand, 16 hours at $48 plus 45%], and [caulk, 8 hours at $48 plus 45% with 24 tubes at $9.50 plus 30%].
```

```
Create a section template in Projul called [Interior mask and cover] with [masking materials, 1 lot at $120 plus 30%] and [8 hours of labor at $48 plus 45%].
```

```
Add [Exterior body coat labor] to my cost-item library in Projul: [$0.95] per sq ft, [45]% markup, labor.
```

```
Add [Interior eggshell, 5 gallon] to my cost-item library in Projul: [$210] each, [30]% markup, material, vendor [Sherwin-Williams].
```

### Scheduling crews

```
Schedule [Whitfield Interior Repaint] in Projul starting [Monday, October 6]: [mask and prep] Monday [8 to 4] with [Luis Ferrer] and [Amy Boyd]; [spot prime and cut in ceilings] Tuesday [8 to 4] with the same two; [ceilings and first coat] Wednesday [8 to 4] adding [Tomas Reyes]; [second coat] Thursday [8 to 4] with [Luis] and [Amy]; [trim, doors and touch-up walk] Friday [8 to 2] with [Luis].
```

```
Create a task on [Cardoza Exterior Repaint] in Projul called [Body coat] with two windows: [Monday 7 to 3] with [Tomas Reyes] and [Amy Boyd], and [Tuesday 7 to 3] with [Tomas Reyes] and [Luis Ferrer].
```

```
Put the [Spray crew] team on the [body coat] task for [Cardoza Exterior Repaint] in Projul.
```

```
Create a task on [Whitfield Interior Repaint] in Projul called [Mask and prep] for [Monday 8 to 4] with [Luis Ferrer] and [Amy Boyd], with these steps: [cover floors and furniture, remove switch plates, tape windows and casing, patch nail holes, sand patches, vacuum and tack cloth].
```

```
Add an unscheduled task to [Whitfield Interior Repaint] in Projul: [order the deep base eggshell and the semi-gloss enamel].
```

```
Create a repeating task in Projul called [Crew meeting and job assignments] every [Monday] at [6:30 am] for [30] minutes with the [Interior crew] and [Spray crew] teams.
```

```
Mark [Mask and prep] and [Spot prime and cut in ceilings] on [Whitfield Interior Repaint] in Projul as complete.
```

### Weather and delays

```
Rain [Wednesday and Thursday]. On [Cardoza Exterior Repaint] in Projul, push [body coat], [trim, fascia and soffits] and [doors and shutters] each two days later and leave the wash and prep where they are.
```

```
Move everything scheduled on [Cardoza Exterior Repaint] in Projul from [Wednesday] onward forward by one day.
```

```
The [exterior acrylic] is not in until [Friday]. Move the [body coat] task on [Cardoza Exterior Repaint] in Projul to [Monday and Tuesday] next week, keep the same crew, and log on the job that the paint order was delayed.
```

```
[Amy Boyd] is out [Thursday and Friday]. Show me every task in Projul she is on those days and swap her for [Tomas Reyes] where he is free.
```

### On the job

```
Log on the [Body coat] task on [Cardoza Exterior Repaint] in Projul that the south wall took a third coat over the old dark stain.
```

```
List the photos on [Cardoza Exterior Repaint] in Projul and attach the [south elevation before] photos to the [scrape, sand and spot prime] task.
```

```
Attach the [color schedule] document on [Whitfield Interior Repaint] in Projul to the estimate.
```

```
Give me a download link for the [signed color approval] on [Whitfield Interior Repaint] in Projul.
```

```
Log on [Whitfield Interior Repaint] in Projul that Nora approved the accent wall color on site today.
```

### Questions to ask your AI

```
What is on the schedule next week in Projul, by painter, with the job and the address?
```

```
Which painting jobs in Projul are sold but have nothing on the schedule yet?
```

```
List every estimate in Projul that is still a Draft, with its job and its total.
```

```
What is the margin on [Cardoza Exterior Repaint] in Projul, and which section is the lowest?
```

```
How much of the [Whitfield Interior Repaint] estimate in Projul has been invoiced, and what is left?
```

```
Which clients in Projul had an exterior painted [three] years ago and have not been back?
```

```
Summarize everything logged on [Ridgeline Unit 12] in Projul since [June].
```

**Note:** Reading works with either key; anything that creates or changes a record needs a Read-Write key. Publishing and sending an estimate or a change order, invoicing, payments and time tracking are done in Projul. See [Which Projul features are not available to my AI yet?](https://knowledge.projul.com/which-projul-features-are-not-available-to-my-ai-yet?hsLang=en)

![The schedule in projul for the week with first exterior repaint task placed on a crew member day](https://knowledge.projul.com/hubfs/Knowledge%20Base%20Import/43334579511319.png)

### Watch it work

Short videos of Projul AI Connect doing this kind of job:

- [Site visit notes to estimate](https://video.projul.com/watch/HA5MRWeouBZbt1zBrTHucu) (1:06)
- [Voicemail to new lead](https://video.projul.com/watch/N65uTakLQhrN8E974mHubu) (0:47)
- [Shift the schedule for a delay](https://video.projul.com/watch/nhxvt6STeHTwkNoWXMuv6o) (0:49)

**New to Projul AI Connect?** Watch the [overview video](https://video.projul.com/watch/zzshbGnjK2shc1coG62oa5) (2:37): what it is, how to set it up, and an estimate built from site notes.

Questions? Let's Chat.  
support@projul.com  
(844) 776-5853

- [How Do I Use Projul?](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#main-content)

    - [Managing Employees / Contractors](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#managing-employees-contractors)
    - [Projects](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#projects)
    - [Support](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#support)
    - [Settings](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#settings)
    - [Scheduling](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#scheduling)
    - [Estimating](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#estimating)
    - [Lead Pipeline](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#lead-pipeline)
    - [Tasks](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#tasks)
    - [Time Tracking](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#time-tracking)
    - [Mobile](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#mobile)
    - [Invoicing](https://knowledge.projul.com/how-do-i-use-projul?hsLang=en#invoicing)
- [Projul FAQ's](https://knowledge.projul.com/projul-faqs?hsLang=en#main-content)

    - [Projul Data Safety & Security](https://knowledge.projul.com/projul-faqs?hsLang=en#projul-data-safety-security)
    - [Billing & Pricing](https://knowledge.projul.com/projul-faqs?hsLang=en#billing-pricing)
- [Projul AI Connect](https://knowledge.projul.com/projul-ai-connect?hsLang=en#main-content)

    - [Projects & Leads](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projects-leads)
    - [Projul AI Connect for Drywall and Insulation Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-drywall-and-insulation-contractors)
    - [Reference](https://knowledge.projul.com/projul-ai-connect?hsLang=en#reference)
    - [Projul AI Connect for Window and Door Installers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-window-and-door-installers)
    - [Connect your AI](https://knowledge.projul.com/projul-ai-connect?hsLang=en#connect-your-ai)
    - [Projul AI Connect for Electricians](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-electricians)
    - [Projul AI Connect for Landscapers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-landscapers)
    - [Tasks & Scheduling](https://knowledge.projul.com/projul-ai-connect?hsLang=en#tasks-scheduling)
    - [Projul AI Connect for Roofers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-roofers)
    - [Troubleshooting & Limits](https://knowledge.projul.com/projul-ai-connect?hsLang=en#troubleshooting-limits)
    - [Projul AI Connect for HVAC Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-hvac-contractors)
    - [Projul AI Connect for Commercial General Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-commercial-general-contractors)
    - [Projul AI Connect for Paving Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-paving-contractors)
    - [Prompt Cookbook](https://knowledge.projul.com/projul-ai-connect?hsLang=en#prompt-cookbook)
    - [Projul AI Connect for Plumbers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-plumbers)
    - [Start here](https://knowledge.projul.com/projul-ai-connect?hsLang=en#start-here)
    - [Projul AI Connect for Excavation Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-excavation-contractors)
    - [Messages](https://knowledge.projul.com/projul-ai-connect?hsLang=en#messages)
    - [Projul AI Connect for Tile Installers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-tile-installers)
    - [Projul AI Connect for Deck Builders](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-deck-builders)
    - [Webhooks](https://knowledge.projul.com/projul-ai-connect?hsLang=en#webhooks)
    - [Projul AI Connect for Pool Builders](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-pool-builders)
    - [Projul AI Connect for Painters](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-painters)
    - [Projul AI Connect for Concrete Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-concrete-contractors)
    - [Projul AI Connect for Restoration Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-restoration-contractors)
    - [Projul AI Connect for Remodelers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-remodelers)
    - [Photos & Files](https://knowledge.projul.com/projul-ai-connect?hsLang=en#photos-files)
    - [Projul AI Connect for Flooring Installers](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-flooring-installers)
    - [Projul AI Connect for Carpenters](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-carpenters)
    - [Projul AI Connect for Home Builders](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-home-builders)
    - [Estimates](https://knowledge.projul.com/projul-ai-connect?hsLang=en#estimates)
    - [Clients](https://knowledge.projul.com/projul-ai-connect?hsLang=en#clients)
    - [Teams](https://knowledge.projul.com/projul-ai-connect?hsLang=en#teams)
    - [Projul AI Connect for Fence Contractors](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-fence-contractors)
    - [Projul AI Connect for Design-Build Firms](https://knowledge.projul.com/projul-ai-connect?hsLang=en#projul-ai-connect-for-design-build-firms)

[![Chill listening crop-3](https://knowledge.projul.com/hs-fs/hubfs/Projul%20Logo%20345PX%20wide.png?width=94&height=24&name=Projul%20Logo%20345PX%20wide.png "Chill listening crop-3")](http://projul.com)

Projul Knowledge Base

Copyright © 2026, Projul Inc