How do I download bulk photos or files from Projul?
On the Photos & Files page, click “Select Photos,” check the first file, then hold Shift and check a later file. This will highlight all files in between, allowing up to 100 files to be downloaded at once.
This method works for either photos or files. In this example, multiple photos will be downloaded. To bulk-download photos:
- Open the "Photos & Files" page from the left sidebar menu
- Filter for the specific pictures to download if needed
- Click the "Select Photos" button at the top of the page to open the photo selector

Each photo will then have a checkbox in the corner of each file. Click on the box of the first file.

Next, hold the Shift key and select the last photo of the group (up to 100). This will then also select all photos between the first and last, selecting multiple photos at the same time.

Last, press the "Download" button located at the top of the page. 100 photos or files can be downloaded at a time. This will download as a zipped folder through the browser.

Questions? Let's Chat.
support@projul.com
(844) 776-5853