How do I have my AI build a concrete estimate?
Describe the slab, footing or driveway the way you'd call it in to your estimator, and your AI builds it in Projul.
Say this
Build an estimate in Projul for [Marchetti Driveway and Patio]. Four sections. Demolition and disposal: [break out and remove existing driveway, 940 SF at $2.10 plus 20%], [haul off and dump fees, 22 tons at $58 plus 20%]. Grade and base: [3/4 inch road base, 4 inches compacted, 18 tons at $32 plus 20%], [compaction, 6 hours at $52 plus 40%]. Forms and reinforcing: [form perimeter and radius at the apron, 152 LF at $3.40 plus 25%], [6x6 welded wire mesh, 1,240 SF at $0.38 plus 25%]. Concrete, placement and finish: [4,000 psi mix with fiber, 5 inches, 20 CY at $178 plus 18%], [placement and finish labor, 26 hours at $48 plus 40%], [cure and seal, 1,240 SF at $0.42 plus 25%]. Apply our [Utah] sales tax.
Give a quantity, unit, cost and markup on each line, and name your sales tax rate.
What happens
Your AI reports the estimate number and total. Click "Estimates" in Projul: the new one sits at the top as a Draft, with each phase priced.

Note: Your AI leaves it as a Draft; reviewing, publishing and sending happen in Projul.
Watch it work
Short videos of Projul AI Connect doing this kind of job:
- Site visit notes to estimate (1:06)
- Change order from notes (0:44)
New to Projul AI Connect? Watch the overview video (2:37): what it is, how to set it up, and an estimate built from site notes.
Questions? Let's Chat.
support@projul.com
(844) 776-5853