How do I have my AI build a drywall and insulation estimate?

Describe the job and your AI builds the priced estimate in Projul, landing in "Estimates" as a Draft.

Say this

Build an estimate in Projul for [Rockwater Lot 42 Hang and Finish]. Five sections: insulation, hang, finish, texture, cleanup and disposal.

Insulation: [R-13 kraft-faced wall batts, 1,850 sq ft at $0.42] plus [25]%, and [22] hours of insulation labor at [$42] plus [45]%.

Hang: [1/2 inch board, 4x12, 186 sheets at $14.80] plus [20]%, and hanging labor at [186 sheets at $12.50 per sheet] plus [40]%.

Finish: [tape, bed, skim and sand, 10,750 sq ft at $0.62] plus [40]%.

Texture: [knockdown texture on walls and ceilings, 10,750 sq ft at $0.18] plus [40]%.

Cleanup and disposal: [one 20-yard dumpster at $475] plus [15]%.

Apply our [Utah] sales tax.

Make a section a choice the client picks between the same way.

On the [Rockwater Lot 42 Hang and Finish] estimate in Projul, make [Texture] a section where the client must choose one: [knockdown at $1,935], [orange peel at $1,613], or [Level 5 smooth at $5,913]. Start with knockdown selected.

What happens

Your AI asks you to approve, then reports the estimate number and total. Click "Estimates" to see it at the top as a Draft.

The estimate editor in Projul with the insulation section expanded showing the priced line items your ai added to basement finish drywall estimate

Note: Your AI leaves the estimate as a Draft; publishing, sending and approval happen in Projul.

Watch it work

Short videos of Projul AI Connect doing this kind of job:

New to Projul AI Connect? Watch the overview video (2:37): what it is, how to set it up, and an estimate built from site notes.

Questions? Let's Chat.
support@projul.com
(844) 776-5853