How do I have my AI build a fencing estimate?
Read your measure sheet to your AI and it builds the fence estimate in Projul, priced from footage, cost and markup.
Say this
Build an estimate in Projul for [Hollis Privacy Fence]. It is [214] lin ft of [6 ft cedar dog-ear privacy fence] with [8 ft] post spacing, plus one [4 ft walk gate] and one [10 ft double drive gate]. Four sections. Tear-out and haul-off: remove [90] lin ft of old chain link, [6] hours of labor at [$45] with [40]% markup, and disposal at [$275] with [15]% markup. Layout and posts: [28] cedar [4x4x8] posts at [$22] each with [25]% markup, [56] bags of concrete at [$6.25] each with [25]% markup, and [12] hours of dig and set labor at [$48] with [40]% markup. Fence build: [81] [2x4x8] rails at [$8.40] each with [25]% markup, [428] cedar pickets at [$4.10] each with [25]% markup, fasteners and hardware at [$180] with [25]% markup, and [24] hours of build labor at [$48] with [40]% markup. Gates and hardware: one [4 ft walk gate kit] at [$310] with [25]% markup, one [10 ft double drive gate with drop rod] at [$890] with [25]% markup, and [6] hours of gate labor at [$52] with [40]% markup. Apply our [Utah] sales tax and tell me the estimate number and the total.
Give the footage, gate count, post spacing, tear-out and your rates. The job needs a project in Projul first; if there isn't one, ask your AI to create the lead in the same request.
What happens
Your AI adds each section and line item with quantity, cost and markup, then reports the estimate number and total. It lands as a Draft at the top of "Estimates" in Projul.

Note: Your AI builds and edits the Draft; publishing and sending it stays with you in Projul.
Questions? Let's Chat.
support@projul.com
(844) 776-5853