How do I have my AI build a plumbing estimate?
Describe the job like a takeoff sheet, section by section with quantities and costs, and your AI builds the estimate in Projul.
Say this
Build an estimate in Projul for [Whitfield Water Heater Replacement]. Three sections. Permit and code items: [plumbing permit, $145, no markup, not taxable], [thermal expansion tank, 1 ea at $68] plus [25]%, [seismic straps, drain pan and pan drain line, 1 lot at $54] plus [25]%, and [sediment trap and flex connectors, 1 lot at $46] plus [25]%. Removal and disposal: [haul away and dispose of the old 50 gallon heater, 1 ea at $45] with no markup, and [1.5] hours of labor at [$72]/hr plus [40]%. Heater and installation: [50 gallon atmospheric gas water heater, 1 ea at $985] plus [25]%, [3/4 inch copper and fittings, 12 lf at $9.20] plus [25]%, [T and P discharge line, 10 lf at $3.40] plus [25]%, [6] hours of plumber labor at [$72] plus [40]%, and [6] hours of apprentice labor at [$42] plus [40]%. Apply our [Utah] sales tax and tell me the estimate number and the total.
What happens
Your AI asks you to approve each step, then reports the estimate number and total. Click "Estimates" in Projul: it sits at the top as a Draft, with a subtotal on each section.

Note: The job needs a project or lead first; your AI can create one if none exists. See How do I have my AI add a new lead?
Watch it work
Short videos of Projul AI Connect doing this kind of job:
- Site visit notes to estimate (1:06)
- Change order from notes (0:44)
New to Projul AI Connect? Watch the overview video (2:37): what it is, how to set it up, and an estimate built from site notes.
Questions? Let's Chat.
support@projul.com
(844) 776-5853