How do I have my AI build a roofing estimate?
Describe the roof to your AI the way you'd tell your estimator, and it builds the estimate on that project in Projul.
Say this
Build an estimate in Projul for [Whitfield Roof Replacement]. Seven sections: tear-off and disposal, decking, underlayment and dry-in, shingles, flashing and metal, ventilation, cleanup and final walk. Tear-off and disposal: [one layer of three-tab off 32 squares at $48 a square] plus [35]%, and [one 20-yard roofing dumpster at $525] plus [15]%. Decking: [allowance of 10 sheets of 7/16 OSB at $28] plus [20]% and [4] hours of decking labor at [$52] plus [40]%. Shingles: [architectural shingles, 34 squares at $112] plus [25]%, [hip and ridge cap, 96 lin ft at $3.85] plus [25]%, and install labor at [32 squares at $95 a square] plus [40]%. Flashing and metal: [drip edge, 180 lin ft at $2.10] plus [25]%, [step flashing at the two dormers, 60 lin ft at $3.20] plus [25]%, and [4] pipe boots at [$28] plus [25]%. Ventilation: [ridge vent, 44 lin ft at $7.40] plus [25]% and [2] hours of labor at [$52] plus [40]%. Cleanup and final walk: [6] hours of cleanup and magnet sweep at [$38] plus [40]%. Apply our [Utah] sales tax.
Give it a quantity, unit, cost and markup on each line, or let it propose numbers for you to correct.
No client yet? See How do I have my AI handle roofing leads and follow-ups?
What happens
Your AI reports the estimate number and total. Click "Estimates" in Projul: the new one is at the top as a Draft, with each section priced.

Note: The estimate is created as a Draft; publishing and sending it are done in Projul.
Watch it work
Short videos of Projul AI Connect doing this kind of job:
- Site visit notes to estimate (1:06)
- Change order from notes (0:44)
New to Projul AI Connect? Watch the overview video (2:37): what it is, how to set it up, and an estimate built from site notes.
Questions? Let's Chat.
support@projul.com
(844) 776-5853