How do I have my AI build a tile estimate?
Describe the job the way you'd brief whoever measures it, and your AI builds a totaled Draft estimate in Projul.
Say this
Build an estimate in Projul for [Castellano Master Bath Tile]. Six sections: demolition and disposal, substrate and prep, waterproofing, tile setting, grout and seal, trim and accessories. Demolition and disposal: [tear out the existing tub surround, tile floor and cement board, 96 sq ft at $3.10] plus [20]%, [12] hours of demo labor at [$42] plus [45]%, and [one 10-yard dumpster at $395] plus [15]%. Waterproofing: [liquid waterproofing membrane, shower walls and pan, 148 sq ft at $2.85] plus [25]%, [pre-sloped foam shower pan, 36 by 60, one at $310] plus [25]%, and [8] hours to waterproof and flood test at [$52] plus [45]%. Tile setting: [12x24 porcelain wall tile, 118 sq ft at $4.60] plus [25]%, [2 inch hex mosaic floor tile, 62 sq ft at $9.80] plus [25]%, and [44] hours of setting labor at [$58] plus [45]%. Apply our [Utah] sales tax.
What happens
Your AI approves each step with you, then gives you the estimate number and total. Click "Estimates" in Projul to see the new Draft at the top, with each section's subtotal shown.

Note: It stays a Draft; publishing and sending an estimate happen in Projul. See Can my AI publish or send an estimate?
Questions? Let's Chat.
support@projul.com
(844) 776-5853