How do tentative tasks work?

Marking a task as "tentative" means the task will show up on the Schedule page, but it will not be visible in the task list of the users it is assigned to until it is changed to "confirmed."

 

To mark a task as tentative:

  1. Navigate to the schedule page from the left sidebar
  2. Open the 3-dot menu on the desired task card
  3. Select "Change to Tentative"

The scheduled task is now tentative. Tentative tasks can be identified by the stripes running across their cards. When a task is tentative, it will be visible within the schedule page (as shown below), but not within the Task List of whoever it is assigned to.

A tentative task can be changed back into a regular task the same way it was changed into a tentative task:

  1. Open the 3-dot menu
  2. Select "Change to confirmed"

 