Copy-paste prompts: window and door installers
Prompts for the work a window and door installer does in Projul. Copy one, change the bracketed parts, and paste it into your AI.
Say this
Add a new lead in Projul for [Rosa Delgado] called [Delgado Whole House Windows] at [418 W Tabernacle St, St. George, UT 84770]. She wants a price on [14 openings of vinyl double-hung and a 6 ft patio slider]. Likelihood of sale [70]%, estimator [Marco Reyes].
Build an estimate in Projul for [Delgado Whole House Windows]: [14] openings of [white vinyl double-hung, Low-E with argon] as a pocket install, plus one [6 ft vinyl patio slider]. Sections: tear-out and disposal, window units, patio door, install labor and materials, capping and trim. [Give the counts, costs and markups for each line.] Apply our [Utah] tax.
What happens
Your AI creates or updates the record in Projul and reports back what it did. Anything that creates or changes a record needs a Read-Write key; a question works with either key.

Note: Publishing and sending an estimate are done in Projul. See Can my AI publish or send an estimate?
Watch it work
Short videos of Projul AI Connect doing this kind of job:
- Site visit notes to estimate (1:06)
- Voicemail to new lead (0:47)
- Shift the schedule for a delay (0:49)
New to Projul AI Connect? Watch the overview video (2:37): what it is, how to set it up, and an estimate built from site notes.
Questions? Let's Chat.
support@projul.com
(844) 776-5853