How do I have my AI build a design-build estimate?
Projul AI Connect for Design-Build Firms
Describe the job like you would brief your estimator, and your AI builds a priced Draft estimate in Projul with a section for each phase.
Say this
Build an estimate in Projul for [Delgado Kitchen and Great Room]. Sections: design and preconstruction, permits and fees, demolition, framing and structural, rough-in, insulation and drywall, finish carpentry, flooring and tile, paint, final clean. Demolition: [dust and floor protection, 16 hours at $52/hr plus 45%]; [30-yard dumpster, 2 each at $625 plus 15%]. Framing: [LVL header and posts, $2,180 plus 25%]; [framing labor, 96 hours at $58/hr plus 45%]. Apply our [Utah] sales tax and give me the total for each section.
The job needs a project or lead first; ask your AI to create one, or see How do I have my AI handle design-build leads and follow-ups? List the phases in order and price each line: a lump sum, or a quantity and unit cost with your markup. For finishes the client hasn't picked, ask for a Selections section instead.
What happens
Your AI approves the action, then it lands in "Estimates" as a priced Draft. Click "Estimates" in Projul to see it and keep editing there or through your AI.

Note: Publishing, sending and approval happen in Projul, not through your AI. See Can my AI publish or send an estimate?
Watch it work
Short videos of Projul AI Connect doing this kind of job:
- Site visit notes to estimate (1:06)
- Change order from notes (0:44)
New to Projul AI Connect? Watch the overview video (2:37): what it is, how to set it up, and an estimate built from site notes.
Questions? Let's Chat.
support@projul.com
(844) 776-5853