How do I have my AI build a restoration estimate?
Describe the loss to your AI, and it builds the estimate in Projul as a Draft ready to review and send.
Say this
Build an estimate in Projul for [Whitcomb Water Loss]. It is a [category 2 supply line failure on the second floor, affecting 640 sq ft across a hallway, bedroom and the ceiling below]. Emergency response and extraction: [after-hours call-out, 1 at $325] no markup, [tech labor, 6 hours at $65] plus [40]% markup, [extraction from carpet and pad, 480 sq ft at $0.65] plus [20]%. Demolition and disposal: [2 ft flood cut, 96 linear feet at $2.40] plus [20]%, [carpet and pad removal, 480 sq ft at $0.55] plus [20]%, [20-yard dumpster, 1 at $525] plus [15]%. Containment and air quality: [6 mil poly barrier, 320 sq ft at $1.10] plus [25]%, [zipper doors, 2 at $38] plus [25]%, [air scrubber, 8 unit days at $75] plus [20]%. Structural drying: [air mover, 48 unit days at $28] plus [20]%, [LGR dehumidifier, 12 unit days at $95] plus [20]%, [antimicrobial application, 640 sq ft at $0.38] plus [25]%, [monitoring visits, 4 at 1.5 hours, $65 per hour] plus [40]%. Insulation and drywall: [R-13 batt, 320 sq ft at $1.15] plus [20]%, [drywall hang and finish, 640 sq ft at $2.85] plus [25]%, [texture, 640 sq ft at $0.95] plus [25]%. Paint and trim: [prime and two coats, 640 sq ft at $1.35] plus [25]%, [baseboard, 96 linear feet at $4.20] plus [25]%. Flooring: [LVP with underlayment, 480 sq ft at $5.60] plus [25]%. Final cleaning and fees: [post-construction clean, $285] plus [20]%, [building permit, $180, no markup, not taxable]. Apply our [Ohio] sales tax and tell me the estimate number and the total.
What happens
Your AI asks you to approve, then gives you the estimate number and total. The new Draft sits at the top of "Estimates" in Projul, with each section priced.

Note: It stays a Draft; publishing and sending an estimate happen in Projul. See Can my AI publish or send an estimate?
Questions? Let's Chat.
support@projul.com
(844) 776-5853