How do I have my AI build a window and door replacement estimate?
Read your measure sheet to your AI and it builds the priced estimate in Projul as a Draft.
Say this
Build an estimate in Projul for [Delgado Whole House Windows]: [13] openings of [white vinyl double-hung, Low-E with argon] and [1] [picture window], pocket install, plus one [6 ft vinyl patio slider]. Tear-out at [0.75] hours per opening at [$52] with [40]% markup, units at [$412] each with [30]% markup, install labor at [1.5] hours per opening at [$58] with [40]% markup, and [186] lin ft of [aluminum capping] at [$4.80] with [30]% markup. Apply our [Utah] tax.
Add a change order to [Delgado Whole House Windows] in Projul called [Rotted sill and framing, kitchen opening]: [1] [sill and framing rebuild] at [$210] in material with [25]% markup and [4] hours of carpentry at [$62] with [40]% markup. Apply our [Utah] tax.
What happens
Your AI adds each section and line, prices it like the editor, and reports the estimate number and total. Click "Estimates" for the Draft; a project already sold gets a change order instead of a new estimate.

Note: Your AI needs a Read-Write key. Publishing, sending, and recording approval stay in Projul. See Can my AI publish or send an estimate?
For scheduling the job, see How do I have my AI schedule window and door replacement crews and jobs?
Questions? Let's Chat.
support@projul.com
(844) 776-5853