How do I have my AI handle concrete leads and follow-ups?
Tell your AI who called, what they want poured, and where the job is, and it creates the lead in Projul.
Say this
Add a new lead in Projul called [Marchetti Driveway and Patio] for a new client, [Dana Marchetti], phone [(435) 555-0142], email [dana@example.com]. Job at [1220 E Riverside Dr, St. George, UT 84790]. Tear out and replace a [two-car driveway] and pour a [patio] out back.
Add a follow-up reminder in Projul on [Marchetti Driveway and Patio] for [next Monday at 8 am] assigned to [Grace Oakes]: [call Dana about the driveway proposal and the finish options].
What happens
Your AI creates the lead in "Lead pipeline" the same as one you add by hand, and can log calls, schedule the site walk, and move the lead forward.

Note: A name matching an existing client's name plus email or phone reuses that client instead of duplicating it.
Next: How do I have my AI build a concrete estimate?
Watch it work
Short videos of Projul AI Connect doing this kind of job:
- Voicemail to new lead (0:47)
- Follow up on waiting estimates (0:45)
New to Projul AI Connect? Watch the overview video (2:37): what it is, how to set it up, and an estimate built from site notes.
Questions? Let's Chat.
support@projul.com
(844) 776-5853